Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.
Absorbine
Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 5lb Bag / 30 Day Supply
Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 5lb Bag / 30 Day Supply
Couldn't load pickup availability
About This
- Every serving delivers: 10,000 mg of glucosamine - 5,000 mg of MSM - 1,200 mg of chondroitin - 150 mg of HA - 130 mg of Boswellia serrata - plus flaxseed and rice bran.
- Use at the first signs of stiffness & no loading dose required. Optimized pellets for advanced joint health and mobility - no fillers!
- Highly concentrated formula supports a horse's muscle, tendon, ligament, synovial fluid, and cartilage health.
- Administer once daily. A 5lb bag is a 30 day supply / a 10lb bag is a 60 day supply.
- Made in the USA.
Share

Collections
-
Cat Toys & Playtime
Spark your cat’s hunting instincts with feather wands, teaser toys, balls, and...
-
Cat Beds, Hammocks & Furniture
Create the perfect lounging spot for your cat with beds, window perches,...
-
Cat Grooming, Litter & Hygiene
Make grooming and litter care easier with cat shampoos, grooming hammocks, litter...
Paws & Claws Corner – Where Happy Pets Find Their Favorites! 🐾🐕🐈
With a passion for pets and a heart for their happiness, Paws & Claws Corner is more than a store—it’s a community for pet lovers.
-
Dog Apparel, Goggles & Accessories
Dress your dog for comfort and protection with jackets, sweaters, sunglasses, goggles,...
-
Dog Beds, Sofas & Furniture
Give your pup a cozy place to rest with plush beds, sofas,...
-
Dog Collars, Harnesses & Safety Gear
Walks made safer and more stylish — collars, harnesses, leashes, seat belts,...
-
Dog Grooming & Bath
Keep coats clean, shiny, and healthy with shampoos, conditioners, grooming kits, and...
Blog posts
View all-
Indoor Comfort and Enrichment: Building a Balan...
Build a calm indoor routine using enrichment toys, supportive beds, hygiene tools, and odor control—organized for both dogs and cats.
Indoor Comfort and Enrichment: Building a Balan...
Build a calm indoor routine using enrichment toys, supportive beds, hygiene tools, and odor control—organized for both dogs and cats.
-
Paw Protection and Outdoor Safety: A Practical ...
A structured approach to paw protection and outdoor safety—boots, walking control, grooming, and home odor control—designed for consistent daily walks.
Paw Protection and Outdoor Safety: A Practical ...
A structured approach to paw protection and outdoor safety—boots, walking control, grooming, and home odor control—designed for consistent daily walks.
-
The Low-Odor Cat Home Blueprint: Litter Setup +...
A practical, low-drama system for cleaner litter areas and reduced odor—built around the right litter box, a realistic cleaning schedule, and grooming tools that help you keep up.
The Low-Odor Cat Home Blueprint: Litter Setup +...
A practical, low-drama system for cleaner litter areas and reduced odor—built around the right litter box, a realistic cleaning schedule, and grooming tools that help you keep up.